April 25th, 1978
Stars Over the River Drin
Drama
0.0
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
© 2025-2026 Cinemaos Private Ltd.
Data provided by Consumet and Tmdb APIAfter the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Production Companies
Find more on:
Lulzimi
Daliu
Pertefi
Pali
Zana
Agroni